Proposal Description
The proposed project entails the development of the Anker grid connection infrastructure which consists of 132kV single/double-circuit overhead power line with the associated infrastructure. A 400m wide (including temporary working area), grid connection corridor is being assessed for the placement of the powerline route. The length of the powerline is dependent on which alternative is authorised.
The alternatives are detailed below:
Alternative (Preferred) route 1: ~0.57km in length.
Alternative route 2: ~3.1km in length.
Alternative route 3: ~4.67km in length
The Anker power line is proposed to connect into the existing Eskom Everest or Leander Substations, or a switching station in proximity to the powerline. A service road beneath the powerline is required for maintenance purposes.
Province(s): Free State
The alternatives are detailed below:
Alternative (Preferred) route 1: ~0.57km in length.
Alternative route 2: ~3.1km in length.
Alternative route 3: ~4.67km in length
The Anker power line is proposed to connect into the existing Eskom Everest or Leander Substations, or a switching station in proximity to the powerline. A service road beneath the powerline is required for maintenance purposes.
Province(s): Free State
Post date
10/04/2024 - 12:41
Last modified
20/11/2024 - 10:36
Reports
Heritage Impact Assessment Specialist Reports | HERITAGE IMPACT ASSESSMENT for the Proposed Grid Connection Infrastructure for the Anker Solar PV Project development | Jenna Lavin | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document |