CaseDetails
    Summary
    Case ID
    22379
    Case Status
    Heritage Authority(s)
    SAHRA
    HFS
    Proposal Description
    The proposed project entails the development of grid connection infrastructure which consists of 132kV single/double-circuit overhead power line with the associated infrastructure. A 400m wide (including temporary working area), grid connection corridor is being assessed for the placement of the powerline route. The length of the powerline is dependent on which alternative is authorised. The alternatives are detailed below:
    Preferred route: ~5.99km in length.
    Alternative route 1: ~18.2km in length.
    Alternative route 2: ~10.6km in length
    The power line is proposed to connect the preferred alternative will commence at the on-site substation and connect to the proposed Phemelo Solar PV facility on-site substation. A service road beneath the powerline is required for maintenance purposes.
    Province(s): Free State
    Author
    carli.steenkamp
    Last modified
    22/11/2024 - 08:49
    Reports
    Heritage Reports linked to this Case
    Heritage Impact Assessment Specialist Reports HERITAGE IMPACT ASSESSMENT Jenna Lavin download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document