    Proposal Description
    The proposed project entails the development of grid connection infrastructure which consists of 132kV single/double-circuit overhead power line with the associated infrastructure on the Portion No. 6 of the Farm Welgegund 86. A 400m wide (including temporary working area), grid connection corridor is being assessed for the placement of the powerline route. The length of the powerline is dependent on which alternative is authorised. The alternatives are detailed below:
    Preferred route: ~5,42km in length.
    Alternative route 1: ~6,41km in length.
    The power line is proposed to connect into the Eskom Everest No 1 Virginia Terminal Overhead Powerline. The alternative grid connection will connect to the Eskom Everest Substation. A service road beneath the powerline is required for maintenance purposes.
    Province(s): Free State
    Author
    carli.steenkamp
    Last modified
    28/11/2024 - 10:08
    Reports
    Heritage Reports linked to this Case
    Heritage Impact Assessment Specialist Reports HERITAGE IMPACT ASSESSMENT Proposed Grid Connection Infrastructure for the Meru Solar PV Project Jenna Lavin download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document
      Interim Comment Access Document