CaseDetails
Summary
Case ID
22405
Case Status
Proposal Description
The application is prepared for registration of the project in terms of the ‘Norm for the Exclusion of Identified Activities Associated with the Development and Expansion of Battery Storage Facilities in Areas of Low or Medium Environmental Sensitivity, published on 27 March 2024’. The registration of the project is to feed power from the proposed BESS into the national grid via the Hermes MTS. Project components include
BESS Site (Assessment Area 24ha, final size to be confirmed < 10 ha)
An 132kV grid connection corridor of approximately 4,5km long and a maximum of 200m wide
A 4-6m maintenance & service road must be constructed within the powerline servitude
IPP Substation – 1 ha
Eskom Switching Station of approximately (1ha)
Operation and Maintenance Buildings (0,5ha)
An access road to the BESS of approximately 300m in length andd between 8 and 10m wide (maximum 12m wide at the turning points)
Province(s): North West
BESS Site (Assessment Area 24ha, final size to be confirmed < 10 ha)
An 132kV grid connection corridor of approximately 4,5km long and a maximum of 200m wide
A 4-6m maintenance & service road must be constructed within the powerline servitude
IPP Substation – 1 ha
Eskom Switching Station of approximately (1ha)
Operation and Maintenance Buildings (0,5ha)
An access road to the BESS of approximately 300m in length andd between 8 and 10m wide (maximum 12m wide at the turning points)
Province(s): North West
Post date
12/04/2024 - 15:57
Last modified
11/11/2024 - 13:23
Reports
Heritage Scoping | Heritage Screener: Hartebeesfontein BESS | Jenna Lavin, Mabeth Crafford | download | |
HIA Phase 1 | HIA: Hartebeestfontein BESS | Jenna Lavin, Nicholas Wiltshire, Mabeth Crafford | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Decision | Access Document |