CaseDetails
Summary
Case ID
22483
Case Status
Proposal Description
RC Kuschke (Pty) Ltd (the ‘Applicant’), a special purpose vehicle of Cainmani (Pty) Ltd (the ‘Developer’), proposes the development of the Kuschke Solar Energy Facility, a Photovoltaic facility with a capacity of up to 360 MW, associated infrastructure and overhead power line (OHL) with a capacity of up to 132 kV. The Kuschke Solar Energy Facility (SEF) is located approximately 11 km south-west of Polokwane in the Limpopo Province. The proposed SEF is located outside of the Renewable Energy Development Zones (REDZ) but within a strategic transmission corridor, the International Corridor. The proposed projects trigger, among others, Activity 1 of Listing Notice 2 of the National Environmental Management Act (NEMA, Act 107 of 1998, as amended) Environmental Impact Assessment Regulations, 2014 (as amended), and therefore requires Scoping and Environmental Impact Assessment (S&EIA) processes to be undertaken.
The 132 kV OHL will connect the proposed Kuschke SEF to the existing Eskom Witkop Main Transmission Substation which is situated ~1,5km north of the proposed Kuschke SEF. In accordance with Regulation 12 (1) of the 2014 NEMA EIA Regulations (as amended), the Project Developer has appointed CES Environmental and Social Advisory Services, to undertake the required S&EIA Processes in order to determine and mitigate the biophysical, social and economic impacts associated with the proposed developments.
Province(s): Limpopo
The 132 kV OHL will connect the proposed Kuschke SEF to the existing Eskom Witkop Main Transmission Substation which is situated ~1,5km north of the proposed Kuschke SEF. In accordance with Regulation 12 (1) of the 2014 NEMA EIA Regulations (as amended), the Project Developer has appointed CES Environmental and Social Advisory Services, to undertake the required S&EIA Processes in order to determine and mitigate the biophysical, social and economic impacts associated with the proposed developments.
Province(s): Limpopo
Post date
24/04/2024 - 11:44
Last modified
17/10/2024 - 13:16
Reports
HIA Phase 1 | HIA for the Proposed Kuschke SEF and Electrical Grid Infrastructure Project, Capricorn District Municipality, Limpopo Province | Neels Kruger | download | |
PIA Desktop | Palaeontological Impact Assessment (Desktop) for the Kuschke Solar PV Facility and EGI, Limpopo Province | Elize Butler | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document | |
Interim Comment | Access Document |