CaseDetails
    Summary
    Case ID
    22483
    Case Status
    Heritage Authority(s)
    SAHRA
    LIHRA
    Proposal Description
    RC Kuschke (Pty) Ltd (the ‘Applicant’), a special purpose vehicle of Cainmani (Pty) Ltd (the ‘Developer’), proposes the development of the Kuschke Solar Energy Facility, a Photovoltaic facility with a capacity of up to 360 MW, associated infrastructure and overhead power line (OHL) with a capacity of up to 132 kV. The Kuschke Solar Energy Facility (SEF) is located approximately 11 km south-west of Polokwane in the Limpopo Province. The proposed SEF is located outside of the Renewable Energy Development Zones (REDZ) but within a strategic transmission corridor, the International Corridor. The proposed projects trigger, among others, Activity 1 of Listing Notice 2 of the National Environmental Management Act (NEMA, Act 107 of 1998, as amended) Environmental Impact Assessment Regulations, 2014 (as amended), and therefore requires Scoping and Environmental Impact Assessment (S&EIA) processes to be undertaken.
    The 132 kV OHL will connect the proposed Kuschke SEF to the existing Eskom Witkop Main Transmission Substation which is situated ~1,5km north of the proposed Kuschke SEF. In accordance with Regulation 12 (1) of the 2014 NEMA EIA Regulations (as amended), the Project Developer has appointed CES Environmental and Social Advisory Services, to undertake the required S&EIA Processes in order to determine and mitigate the biophysical, social and economic impacts associated with the proposed developments.
    Province(s): Limpopo
    Author
    neels.kruger
    Last modified
    17/10/2024 - 13:16
    Reports
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document
      Interim Comment Access Document