Proposal Description
Green Gate Energy (Pty) Ltd is proposing the construction and operation of a Photovoltaic (PV) Solar Energy Facility and associated infrastructure on Portion 1 of the Farm Steenbokpan 295 LQ, Limpopo province. The project is located approximately 4km northeast of Steenbokpan and 42 km west of Lephalale, within the Lephalale Local Municipality and the Waterberg District Municipality.
The facility will have a contracted capacity of up to 230MW and will be known as Vangpan Solar PV. The project is proposed to be developed in two phases, with phase 1 comprising the construction of up to 60MW, and phase 2 comprising the construction of up to 170MW. For phase 1 power will be evacuated by a 132kV OHL to the Eskom Theunispan Substation located directly south of the site. This will be a radial feed from the new on-site facility substation to the Theunispan substation. Both phases of the Vangpan Solar PV project as well as the grid connection to the Theunispan Substation will be considered in one report (Scoping/EIA).
Province(s): Limpopo
The facility will have a contracted capacity of up to 230MW and will be known as Vangpan Solar PV. The project is proposed to be developed in two phases, with phase 1 comprising the construction of up to 60MW, and phase 2 comprising the construction of up to 170MW. For phase 1 power will be evacuated by a 132kV OHL to the Eskom Theunispan Substation located directly south of the site. This will be a radial feed from the new on-site facility substation to the Theunispan substation. Both phases of the Vangpan Solar PV project as well as the grid connection to the Theunispan Substation will be considered in one report (Scoping/EIA).
Province(s): Limpopo
Post date
26/04/2024 - 10:55
Last modified
21/10/2024 - 09:39
Reports
HIA Phase 1 | Proposed Vangpan Solar Photovoltaic Facility and Associated Infrastructure | Shannon Hardwick | download | |
HIA Phase 1 | Proposed Vangpan Solar Photovoltaic Facility and Associated EGI Infrastructure - Heritage Impact Assessment Report | Wouter Fourie | download | |
HIA Phase 1 | Proposed Vangpan Solar Photovoltaic Facility and Associated Infrastructure | Shannon Hardwick | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document | |