This project will entail the upgrading of an existing 1.15km long, 5m wide gravel road and
associated stormwater structures. The following scope of works apply:
• Rip and re-compact up to a depth of 150mm
•150mm Subbase Layer of G7 Material
•150mm Base layer of G5 material
• 150mm Concrete Wearing Course
• Construction of kerb – 1.150km
• Construction of Concrete V-Drain – 1.150km
• 5 pipe crossings of 900mm diameter each with headwalls and catchpits
associated stormwater structures. The following scope of works apply:
• Rip and re-compact up to a depth of 150mm
•150mm Subbase Layer of G7 Material
•150mm Base layer of G5 material
• 150mm Concrete Wearing Course
• Construction of kerb – 1.150km
• Construction of Concrete V-Drain – 1.150km
• 5 pipe crossings of 900mm diameter each with headwalls and catchpits