CaseDetails
Summary
Case ID
22544
Case Status
Proposal Description
A power line grid connection must be authorised to include the following project components:
An approximately 40km grid connection corridor
Capricorn IPP Substation & Eskom Switching Station;
Sagittarius IPP Substation & Eskom Switching Station;
Scorpio IPP Substation & Eskom Switching Station;
Taurus IPP Substation & Eskom Switching Station;
A Main Collector Substation;
4 x Single / double circuit overhead power lines of up to 132 kV will link each of these four sites to a proposed Main Collector Substation;
The Main Collector Substation will connect via 2 x 132kv single circuit overhead power lines to Carmel MTS;
Maintenance and service road of between 4-6 m within the route corridor.
Both underground and/or overhead cabling between project components of up to 132 kV is considered.
Province(s): Gauteng
An approximately 40km grid connection corridor
Capricorn IPP Substation & Eskom Switching Station;
Sagittarius IPP Substation & Eskom Switching Station;
Scorpio IPP Substation & Eskom Switching Station;
Taurus IPP Substation & Eskom Switching Station;
A Main Collector Substation;
4 x Single / double circuit overhead power lines of up to 132 kV will link each of these four sites to a proposed Main Collector Substation;
The Main Collector Substation will connect via 2 x 132kv single circuit overhead power lines to Carmel MTS;
Maintenance and service road of between 4-6 m within the route corridor.
Both underground and/or overhead cabling between project components of up to 132 kV is considered.
Province(s): Gauteng
Post date
07/05/2024 - 08:29
Last modified
30/05/2024 - 14:18
Reports
Heritage Scoping | Heritage Screener: Ash to Carmel MTS | Jenna Lavin, Mabeth Crafford | download | |
HIA Phase 1 | HIA: Ash to Carmel MTS | Jenna Lavin, Mabeth Crafford | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Interim Comment | Access Document |