CaseDetails
    Summary
    Case ID
    22563
    Case Status
    Heritage Authority(s)
    SAHRA
    NWPHRA
    Proposal Description
    The Izimvu Energy Facility Project comprises of a Battery Energy Storage System (BESS) facility with ancillary and associated infrastructure (authorised separately), a substation (approximately 0.3ha), a grid connection corridor (approximately Option 1: 12.8km, Option 2: 9.6km in length which will include a 32m wide powerline servitude from Rustenburg Industries 88/33KV Substation to Ararat 275/88KV MTS Substation ) and an access road (approximately 10m – 12m in width). This project is considered a vital initiative with the specific aim to open up the grid capacity and assist in alleviating the recurring issue of load shedding experienced by Eskom.

    Province(s): North West
    Author
    jenna.lavin
    Last modified
    09/06/2024 - 13:03
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 HIA: Izimvu Grid Jenna Lavin download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document