CaseDetails
    Summary
    Case ID
    22564
    Case Status
    Heritage Authority(s)
    SAHRA
    NWPHRA
    Proposal Description
    The Aalwyn Energy Facility Project comprises of a Battery Energy Storage System (BESS) facility with ancillary and associated infrastructure (authorised separately), a substation (approximately 1.5ha), a grid connection corridor (approximately Option 1: 3.8km, Option 2: 4.76km, Option 3: 4.5km, Option 4: 6km in length which will include a 32m wide powerline servitude within) and an access road (approximately 10m – 12m in width and 222m in length). This project is considered as a vital initiative with the specific aim to open up the grid capacity and assist in alleviating the recurring issue of load shedding experienced by Eskom.

    Province(s): North West
    Author
    jenna.lavin
    Last modified
    12/06/2024 - 14:09
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 HIA: Aalwyn Grid Jenna Lavin download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document
      Interim Comment Access Document