PINE POWER LINE GRID CONNECTION CORRIDOR
Capella
Grid connection corridor (±1.5km in length and maximum 970m wide)
IPP substation and Eskom switching station (1 hectare)
2x Access points
Strelitzia
Grid connection corridor (±1.8km in length and maximum 970m wide)
IPP substation and Eskom switching station (1.5 hectares)
The roads will be between 8m and 10m wide and up to 12m at turning points.
A maintenance and services road of between 4m and 6m wide will be constructed within the 31m power line servitude
Province(s): North West
Capella
Grid connection corridor (±1.5km in length and maximum 970m wide)
IPP substation and Eskom switching station (1 hectare)
2x Access points
Strelitzia
Grid connection corridor (±1.8km in length and maximum 970m wide)
IPP substation and Eskom switching station (1.5 hectares)
The roads will be between 8m and 10m wide and up to 12m at turning points.
A maintenance and services road of between 4m and 6m wide will be constructed within the 31m power line servitude
Province(s): North West
Post date
09/05/2024 - 15:13
Last modified
09/06/2024 - 20:26
Reports
HIA Phase 1 | HIA: Pine Grid | Jenna Lavin | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Interim Comment | Access Document |