Proposal Description
Eskom Holdings SOC Ltd, Limpopo Operating Unit (LOU) intends to construct a Medium Voltage (MV) power line for the above-mentioned project. The power line is approximately 455m in length and will T-off from the existing power line at pole number RH92/67/122/6(refer to the Span plan sheets and the Pegging Coordinates for more information). The line will be built on portion 15 KLIPDRIFT 90JR which is under the jurisdiction of Tswane Local Municipality, Gauteng Province.
Environmental Screening of the powerline route was conducted during pegging of the power line route by the Survey team and site verification done by the Environmental Practitioner which led to the generation of the servitude planning documents [Distribution Environmental Screening Document (DESD), Wayleave, Span plan and Pegging coordinates attached for your reference]. Heritage resources such as properly fenced off gave yards according were not observed on site, see 6.3 of the DESD. The area is a Game Reserve with various existing infrastructure including medium voltage power lines, residential areas. restaurants, tar roads and dirt roads.
Given the observation that the area is already disturbed, Eskom LOU here by notifies SAHRA of the proposed construction of the powerline which is more than 300M in length. However, should any of the heritage resources, including graves or human remains be encountered or discovered during construction, Eskom shall immediately cease construction, inform SAHRA office, other relevant Department and as soon as possible contract a professional archaeologist to inspect the findings and conduct investigation as prescribed by the Act .
Province(s): Gauteng
Environmental Screening of the powerline route was conducted during pegging of the power line route by the Survey team and site verification done by the Environmental Practitioner which led to the generation of the servitude planning documents [Distribution Environmental Screening Document (DESD), Wayleave, Span plan and Pegging coordinates attached for your reference]. Heritage resources such as properly fenced off gave yards according were not observed on site, see 6.3 of the DESD. The area is a Game Reserve with various existing infrastructure including medium voltage power lines, residential areas. restaurants, tar roads and dirt roads.
Given the observation that the area is already disturbed, Eskom LOU here by notifies SAHRA of the proposed construction of the powerline which is more than 300M in length. However, should any of the heritage resources, including graves or human remains be encountered or discovered during construction, Eskom shall immediately cease construction, inform SAHRA office, other relevant Department and as soon as possible contract a professional archaeologist to inspect the findings and conduct investigation as prescribed by the Act .
Province(s): Gauteng
Post date
14/05/2024 - 17:39
Last modified
20/05/2024 - 12:00