The scope of work is constructing Schurvekop Substation, a 132 kV metering point and switching station, and a 9km 132kV line from the existing Eskom Ysterkop 132/22kV substation to the proposed Schurvekop Substation.
The Application for Environmental Authorisation is for the construction of the following:
Construct a ± 9km overhead 132kV lines, from the proposed Schurvekop Switching station to Eskom Ysterkop substation.
Construct a Switching station.
Construct Power line structures/ stayed monopole steel poles within 32 meters of a waterbody along the 132kV feeder line and excavate more than 10 cubic metres of soil and rock from a watercourse.
Clear an area of 1.38 hectares for the Schurvekop switching station and Schurvekop Substation site.
Clear more than 300 square metres of indigenous vegetation (1.25ha) to construct a temporary laydown area.
Develop access roads of wider than 4 metres to construct the power line.
Construct a 1 X 10 MVA, 132/11kV Schurvekop substation.
Province(s): Mpumalanga
The Application for Environmental Authorisation is for the construction of the following:
Construct a ± 9km overhead 132kV lines, from the proposed Schurvekop Switching station to Eskom Ysterkop substation.
Construct a Switching station.
Construct Power line structures/ stayed monopole steel poles within 32 meters of a waterbody along the 132kV feeder line and excavate more than 10 cubic metres of soil and rock from a watercourse.
Clear an area of 1.38 hectares for the Schurvekop switching station and Schurvekop Substation site.
Clear more than 300 square metres of indigenous vegetation (1.25ha) to construct a temporary laydown area.
Develop access roads of wider than 4 metres to construct the power line.
Construct a 1 X 10 MVA, 132/11kV Schurvekop substation.
Province(s): Mpumalanga
Post date
16/05/2024 - 17:10
Last modified
04/07/2024 - 15:26
Reports
HIA Phase 1 | HIA Schurvekop | Jaco van der Walt | download, download | |
PIA Desktop | Palaeontological Impact Assessment Schurvekop | Marion Bamford | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document |