    Proposal Description
    This grid connection will evacuate the energy generated by the Zaaiplaats Solar PV1 facility to the national grid via the Mercury MTS.
    The project components include the following:
    Eskom switching station (100m x 100m)
    132kV power line of approximately 3,6km in length
    Corridor width up to 250m
    Existing access roads to the powerline will be used. Where and if required, a new approximately 6m wide access road will be developed for construction, maintenance and inspection purposes within the servitude area
    Province(s): Free State