CaseDetails
    Summary
    Case ID
    22783
    Case Status
    Heritage Authority(s)
    SAHRA
    NBKB
    Proposal Description
    Proposed 400kV Powerline from Ferrum to Upington Substations, within the ZF Mgcawu and John Taolo Gaetsewe District Municipalities, Northern Cape Province
    The proposed Project entails the construction of a 400 kV power line from Ferrum Substation to Upington Substation, and associated feeder bays.
    Authorisation for the Project was initially granted by the DFFE, which was then referred to as the DEA, on 24 April 2014 (DEA Reference 12/12/20/2607). However, since then, there have been deviations to the power line as a result of negotiations and land being proclaimed as a nature reserve.
    These deviations have resulted in the line moving outside of the authorised corridor, which need to be authorised in terms of NEMA. The 2014 EA subsequently lapsed and hence a new Basic Assessment Process (BA) has been undertaken. Note that this new BA process, has been undertaken for the entire route and not just the new deviations and includes both the previously authorised corridor and proposed 90m deviation corridor.


    Province(s): Northern Cape
    Author
    nemai.consulting
    Last modified
    14/10/2024 - 14:13
    Reports
    Heritage Reports linked to this Case
    PIA Desktop Desktop PIA: Ferrum-Upington 400kV Powerline Elize Butler download
    HIA Phase 2 Heritage Walkdown Report: Ferrum-Upington 400kV Jennifer Kitto, Nkosinathi Godfrey Tomose download
    HIA Phase 1 HIA Ferrum-Upington 400kV Powerline, Northern Cape Jennifer Kitto download
    Official
    Case Officers
    Action Tags
    Status
    Requested
    Action Requested
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document
      Interim Comment Access Document