The applicant, Impower Langside 10MW Wheeling Project (Pty) Ltd is proposing the construction and operation of a 30 Megawatt (MW) Solar Photovoltaic (PV) facility and associated infrastructure on Portion 7 of Farm 198 Langside near Komani in the Eastern Cape Province. The associated infrastructure includes:
- Laydown Area;
- Access and Internal Road Network;
- Auxiliary Buildings;
- IPP Substation;
- Eskom Substation
-Loop in Loop out powerline
- Inverter Stations, transformers and internal electrical reticulation
- Perimeter Fencing and Security Infrastructure; and
- Battery Energy Storage System.
- Laydown Area;
- Access and Internal Road Network;
- Auxiliary Buildings;
- IPP Substation;
- Eskom Substation
-Loop in Loop out powerline
- Inverter Stations, transformers and internal electrical reticulation
- Perimeter Fencing and Security Infrastructure; and
- Battery Energy Storage System.
Post date
17/07/2024 - 12:40
Last modified
17/07/2024 - 12:40
Reports
HIA Phase 1 | HERITAGE IMPACT ASSESSMENT - PROPOSED DEVELOPMENT OF A 30MW PV SOLAR FACILITY, LANGSIDE FARM, EASTERN CAPE | Jenna Lavin | download | |
Visual Impact Assessment | VISUAL IMPACT ASSESSMENT FOR THE PROPOSED LANGSIDE SOLAR ENERGY FACILITY, EASTERN CAPE, SOUTH AFRICA | Peter Velcich | download |