CaseDetails
    Summary
    Case ID
    23095
    Case Status
    Heritage Authority(s)
    SAHRA
    PHRA-G
    Proposal Description
    Rand Water is proposing the construction and maintenance of the Rand Water O6, B17/18
    and B16 pipelines with its associated structures. The O6 pipeline will extent from the Palmiet
    Pumping station to Klipfontein, covering 16 km approximate. The O6 pipeline forms part of
    several projects intended to augment the water supply to the Palmiet Pumping Station
    Supply System. The internal diameter of the O6 pipeline will range between 1800mm to
    2100mm.
    The B17/B18 pipelines are aimed at supplying the projected water demands at the
    Zuikerbosch pumping station to the Palmiet Pumping station. The B17/B18 pipelines will have
    a diameter of 2300mm with a total length of 46km, this project will also incorporate the
    construction and maintenance of the remainder of Rand Water B16 pipeline from
    Zuikerbosch pumping station to Slangfontein with a diameter of 2100mm and a total length
    of 18km.
    The proposed O6, B17/B18 and B16 pipeline must comply with the requirements stipulated in
    the National Heritage Resources Act, 1999 (Act 25 of 1999) (NHRA) Section 38 of NHRA,
    subject to the provisions of subsections (3) to (10), in conjunction with the environmental
    legislation that requires public participation as part of an application for authorisation or
    approval; namely the National Environmental Management Act (NEMA, Act No. 107 of
    1998). The Projects have previously been issued with HIA’s RoD’s but have expired, hence the
    re-application. In terms of NEMA Authorisations, the project’s Environmental Authorisations
    are still valid.
    The new B16 pipe operates in parallel with the existing B8 pipe and that the B9 and B18
    Slangfontein link reduces flow or ceases to operate for the short term. The B9//B18 pipes
    remain as a backup supply in times when either sections of or entire lengths of the B16 or B8
    are out of commission for repairs. As the B16 runs out of capacity at a future point, the
    B9//B18 can again supply water regularly to Mapleton from the Palmiet system. It is likely that
    the Palmiet B17 will be augmented before the B16 is duplicated, so this will be the logical role
    of the B9/B18. These pipelines are aimed at supplying the projected water demands. The
    proposed pipelines will be constructed within the jurisdictions of the following municipalities:
    Emfuleni Local Municipality, Ekurhuleni Local Municipality and Midvaal Local
    Municipality, Gauteng Province.
    Province(s): Gauteng
    Author
    Nomkhosi.Mohlahlo
    Last modified
    19/08/2024 - 16:03
    Reports
    Heritage Reports linked to this Case
    Heritage Impact Assessment Specialist Reports PHASE 1 HERITAGE IMPACT ASSESSMENT FOR THE PROPOSED CONSTRUCTION AND MAINTENANCE OF THE OF RAND WATER B16_B17 and O6 PIPELINE Leonie Marais download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document