CaseDetails
Summary
Case ID
23153
Case Status
Proposal Description
Exigent Engineering Consultants (hereinafter referred to as Exigent) has been appointed by Schoongezicht Thermal Power Plant (Pty) Ltd to undertake the EIA proses in order to determine the biophysical, social and economic impacts associated with the construction and operation of a Gas Thermal Power Plant on 22.4ha of Portion 4 of Farm RONDAVEL ALIAS SCHOONGEZICHT 109 JR (314.5699ha in total) located within the City of Tshwane Metropolitan Municipality in Gauteng Province). The maximum export capacity at the delivery point will be 800 MW. The TPP will connect to the Sasol Springs, Pretoria/Rosslyn-Babelegi pipeline (RBP) pipeline that is located within the servitude K 6236/2002-5 that is located adjacent to the TPP site, Portion 4 of Farm Rondavel Alias Schoongezicht 109 JR.
Province(s): Gauteng
Province(s): Gauteng
Post date
26/07/2024 - 11:17
Last modified
15/11/2024 - 10:31
Reports
PIA Desktop | Palaeontological Impact Assessment for the proposed Lusthof Solar Farms and Powerline project, south of Hammanskraal, Gauteng Province | Marion Bamford | download | |
Heritage Scoping | SSVR FOR THE SCHOONGEZICHT THERMAL POWER PLANT, CITY OF TSHWANE METRO MUNICIPALITY, GAUTENG PROVINCE | Neels Kruger | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document |