Proposal Description
Mogobe EGI (Pty) Ltd (‘the Applicant’) is proposing the construction of up to 132 kV Electrical Grid Infrastructure (EGI) to support the Mogobe BESS project located on Portion 1 of the Farm Legoko 460, south east of the town of Kathu within the Gamagara Local Municipality in the Northern Cape Province. The EGI will traverse Portion 1 of the Farm Legoko 460 and portions 2, 10 & the Remaining Extent of Farm Sekgame 461. The site is accessible via the existing farm access from the N14. The Mogobe EGI will comprise of the following:
• A 132 kV double circuit monopole and/or lattice tower overhead power line, approximately 9.0 km in length and 30 m in height to connect to the Existing Eskom Ferrum Substation located within an approved corridor of approximately 200 m wide. The power line will be constructed within an approximately 31 m wide servitude.
• A service road of approximately 4 m wide below the power line.
• An on-site switching station, with an estimated footprint of 1.0 ha and up to 5 m in height, at the Mogobe BESS facility. This refers specifically to Eskom’s section of the on-site substation, planned to be at 132 kV, which will be transferred from the IPP to Eskom. Lightning masts of up to 21 m will be installed within the substation yard, and
• Associated electrical infrastructure at the Eskom Ferrum Substation. This will include but not limited to a new feeder bay which comprises of the extension to the existing platform and busbars of the 132 kV yard inside Eskom Ferrum Substation.
Province(s): Northern Cape
• A 132 kV double circuit monopole and/or lattice tower overhead power line, approximately 9.0 km in length and 30 m in height to connect to the Existing Eskom Ferrum Substation located within an approved corridor of approximately 200 m wide. The power line will be constructed within an approximately 31 m wide servitude.
• A service road of approximately 4 m wide below the power line.
• An on-site switching station, with an estimated footprint of 1.0 ha and up to 5 m in height, at the Mogobe BESS facility. This refers specifically to Eskom’s section of the on-site substation, planned to be at 132 kV, which will be transferred from the IPP to Eskom. Lightning masts of up to 21 m will be installed within the substation yard, and
• Associated electrical infrastructure at the Eskom Ferrum Substation. This will include but not limited to a new feeder bay which comprises of the extension to the existing platform and busbars of the 132 kV yard inside Eskom Ferrum Substation.
Province(s): Northern Cape
Post date
29/07/2024 - 08:38
Last modified
27/09/2024 - 14:28
Reports
HIA Phase 1 | Heritage Impact Assessment for the proposed Electrical Grid Infrastructure to Support the Mogobe Battery Energy Storage System. | Jayson Orton | download | |
PIA Desktop | Paleontology Impact Assessment for the proposed Electrical Grid Infrastructure to support the Mogobe Battery Energy Storage System. | Elize Butler | download | |
Visual Impact Assessment | Visual Impact Assessment for the proposed Electrical Grid Connection Infrastructure to support the Mogobe Battery Energy Storage System | Stephen Stead | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document |