CaseDetails
    Summary
    Case ID
    23220
    Case Status
    Heritage Authority(s)
    SAHRA
    MPHRA
    Proposal Description
    The Thembisile Hani Local Municipality (THLM) intends to construct a new Waste Water Treatment Works (WWTW) and associated outfall sewers in the Kwamhlanga area. The initial phase (Phase 1 – this application) will involve the construction of a 3 Mℓ/day Biological Nutrient Removal (BNR) WWTW with the capacity to be expanded to 15 Mℓ/day. The outfall sewer lines will range from 160mm to 450mm in diameter and will be approximately 5.48 km in length. Pipe bridges or trench excavations with concrete encasings will be used through the wetland/stream sections. The WWTW and outfall sewers will be situated on the Remainder of the farm Kwamhlanga 617 JR, Kwamhlanga, Mpumalanga.
    Province(s): Mpumalanga
    Author
    rianaxena
    Last modified
    18/09/2024 - 13:02
    Reports
    Heritage Reports linked to this Case
    PIA Desktop Lithuli PIA Exemption Letter Heidi Fourie download
    HIA Phase 1 Lithuli WWTW HIA Anton van Vollenhoven download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Interim Comment Access Document