CaseDetails
Summary
Case ID
23223
Case Status
Proposal Description
The Thembisile Hani Local Municipality plans to install a new water pipeline between Gemsbokspruit Reservoir and Tweefontein D Reservoir to allow for the transfer of approximately 312.5 3m/h of water between the two reservoirs. The pipeline will be ±9.6 km long and 355 mm in diameter with a design flow of 87 l/s. The pipeline will be located mostly within road reserves and will extend along the edges of the residential areas of Tweefontein D, Tweefontein A, Tweefontein IA and Vlaklaagte CC. The water pipeline will extend across the RE of Tweefontein 675 JR, RE/54 of Tweefontein 220 JR, RE/7 of Gemsbokspruit 229 JR and possibly RE/1 of Vlaklaagte 221 JR, Tweefontein, Mpumalanga.
Province(s): Mpumalanga
Province(s): Mpumalanga
Post date
01/08/2024 - 11:56
Last modified
26/11/2024 - 13:52
Reports
HIA Phase 1 | HIA Tweefontein Water Pipeline | Anton van Vollenhoven | download | |
PIA Desktop | PIA Tweefontein Water Pipeline | Heidi Fourie | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Interim Comment | Access Document |