CaseDetails
    Summary
    Case ID
    23227
    Case Status
    Heritage Authority(s)
    SAHRA
    HFS
    Proposal Description
    Proposed construction of a new wastewater treatment facility with a daily throughput capacity of 7Ml per day on an area with an extent of approximately 3.5 hectares on the Farm Mooifontein No. 669 within the municipal jurisdiction. The facility will connect to the existing WWTW with an underground connector and the total capacity would be 8Ml/day with a total development footprint of approximately 10 hectares. The new facility includes a channel to discharge the treated effluent to the neighbouring watercourse, Sandspruit.
    Province(s): Free State
    Author
    lorato.tigedi
    Last modified
    19/11/2024 - 10:22
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 Phase 1 Heritage Impact Assessment_Kestell WWTW Anton Pelser download
    PIA Phase 1 PIA Proposed Kestell WWTW Elize Butler download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document