CaseDetails
    Summary
    Case ID
    23312
    Case Status
    Heritage Authority(s)
    SAHRA
    HFS
    Proposal Description
    This application is for the proposed development of the Thyme Battery Energy Storage System Facility near Excelsior, Free State Province. The proposed BESS Facility will connect to the 275/88 kV Merapi MTS Substation. For the proposed Thyme BESS Facility to connect to the electrical grid, the normal components of a distribution rated electrical substation will also be required. The connection power line will be constructed within the limits of a proposed grid connection corridor and the proposed grid connection and corridor will be assessed in a separate Basic Assessment process.
    Province(s): Free State
    Author
    jenna.lavin
    Last modified
    12/09/2024 - 10:52
    Reports
    Heritage Reports linked to this Case
    Heritage Scoping Heritage Screener: Thyme BESS Jenna Lavin, Mabeth Crafford download
    HIA Phase 1 HIA: Thyme BESS Jenna Lavin, Mabeth Crafford, Nicholas Wiltshire, Ryan Nel download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Decision Access Document