CaseDetails
Summary
Case ID
23312
Case Status
Proposal Description
This application is for the proposed development of the Thyme Battery Energy Storage System Facility near Excelsior, Free State Province. The proposed BESS Facility will connect to the 275/88 kV Merapi MTS Substation. For the proposed Thyme BESS Facility to connect to the electrical grid, the normal components of a distribution rated electrical substation will also be required. The connection power line will be constructed within the limits of a proposed grid connection corridor and the proposed grid connection and corridor will be assessed in a separate Basic Assessment process.
Province(s): Free State
Province(s): Free State
Post date
14/08/2024 - 11:25
Last modified
12/09/2024 - 10:52
Reports
Heritage Scoping | Heritage Screener: Thyme BESS | Jenna Lavin, Mabeth Crafford | download | |
HIA Phase 1 | HIA: Thyme BESS | Jenna Lavin, Mabeth Crafford, Nicholas Wiltshire, Ryan Nel | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Decision | Access Document |