CaseDetails
Summary
Case ID
23316
Case Status
Proposal Description
The proposed BESS Energy Facility (EF) will connect to the Harvard Substation 275/132 kV MTS Substation. For the proposed Pepper BESS Energy Facility to connect to the electrical grid, the normal components of a distribution rated electrical substation will also be required. The connection power line will be constructed within the limits of a proposed grid connection corridor or Via a LILO (Loop-in, Loop-Out) connection known as "Fox Power Line" which will be done in a separate BA process.
Province(s): Free State
Province(s): Free State
Post date
14/08/2024 - 11:47
Last modified
23/09/2024 - 11:32
Reports
Heritage Scoping | Heritage Screener: Pepper BESS | Jenna Lavin, Mabeth Crafford | download | |
HIA Phase 1 | HIA: Pepper BESS | Jenna Lavin, Mabeth Crafford, Nicholas Wiltshire, Ryan Nel | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Decision | Access Document |