CaseDetails
    Summary
    Case ID
    23337
    Case Status
    Heritage Authority(s)
    SAHRA
    HFS
    Proposal Description
    The South African National Roads Agency SOC Limited (SANRAL) has identified the need to improve operational conditions on the existing N3 Toll Highway between Harrismith (N3/7X km 35.5) and Warden (N3-8X km 24.6). Operational conditions will be improved by the construction of 7 (seven) interchanges, 5 (five) bridge widenings, widening of two major culverts and the linking of various properties to the newly constructed interchanges.
    Further investigation has identified the need to upgrade the current Eeram underpass underneath the N3 Toll Road at N3-7X km 53.6. The current underpass structure will be reconstructed in phases to a 10m wide structure. The structure would be extended by 2.5m on each side (to the North and South). A temporary fill would be constructed to the West of the culvert (inside the road reserve) to assist with the accommodation of traffic. Short linkages to the existing farmer’s access roads would be required to link these roads to the existing road network.

    Province(s): Free State
    Author
    etienne.vanderlith
    Last modified
    16/10/2024 - 14:04
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 Cultural Heritage Impact Assessment Eeram Johnny van Schalkwyk download, download, download
    Palaeontological Permit Report PALAEONTOLOGICAL ASSESSMENT Elize Butler download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document