    Proposal Description
    Background
    Setala Environmental (Pty) Ltd has been appointed as the independent environmental assessment practitioner (EAP) to undertake the Environmental Impact Assessment (EIA) for the Applicant (Uretech Holdings (Pty) Ltd). The development entails the storage and handling of a dangerous good, Liquefied Petroleum Gas (LPG), where such storage occurs in containers with a combined capacity of less than 500 cubic metres (m3). The project site (study site) is located on Portion 253 of the Farm Hartebeestfontein 445-JQ, which is situated north of the Hartebeespoort Dam and Magaliesberg Ridge; south of the N4 and Brits; and immediately west of the R511. The site is approximately 9.2 hectares in extent.

    Scope of the Project
    The development entails the storage and handling of a dangerous good (LPG) where such storage occurs in containers with a combined capacity of less than 500 cubic metres.
    The applicant proposes to construct two mounded LPG Vessels of 67 500 liters each which equates to 135 000 liters/ 135 cubic meters.

    Associated Infrastructure for the development entails:
    1. Bulk Vessels and Storage Tanks
    2. Cylinder Filling Area
    3. Cylinder Storage Area
    4. Firefighting Equipment
    5. Fencing and Barriers
    6. Emergency Response Facilities
    7. Utility Connections
    8. Access road
    9. Lighting
    10. Drainage Systems
    11. Ventilation Systems
    12. Signage and Markings
    13. Safety Barriers and Guards
    14. Facility Buildings
    Province(s): North West
    Author
    ria.pretorius
    Last modified
    03/12/2024 - 09:40
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 HIA Hartebeestfontein 445-JQ Portion 253 Jaco van der Walt download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document