CaseDetails
    Summary
    Case ID
    23949
    Case Status
    Heritage Authority(s)
    SAHRA
    MPHRA
    Proposal Description
    NTCSA proposes Deviation of sections of the previously authorised Hendrina – Praire
    - Marathon 400KV Transmission Line project (EIA reference 12/12/20/915). The
    proposed deviations are located on the line between Gumeni and Marathon
    substations. The proposed project consists of four (4) deviations:
    • Gumeni deviation – (covering 4.3 km in length);
    • Roodewal deviation – (covering 2km in length);
    • Belmont deviation – (covering 1.2 km in length); and
    • Marathon deviation - (covering 400m in length).
    The total line length between Gumeni and Marathon is approximately 93 km. The
    deviations cover a total area of 7.9 km will and a new servitude of 55 m wide will
    be created to cater for this transmission line. The full length of the line runs parallel
    to the Marathon – Prairie 1 and 2 275 kV lines.
    The approved design of the proposed project includes the following:
    • Phase Conductor: 3 x IEC 315 at 50deg C
    • Tower Types: 529A/C, 515B, 515H and 515 strain towners (occasional use of
    518H, 518C and 518D).
    • Ground Clearance: 10m
    Province(s): Mpumalanga
    Author
    Caiphus Mukwevho
    Last modified
    05/03/2025 - 09:34
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Interim Comment Access Document