CaseDetails
Summary
Case ID
23955
Case Status
Proposal Description
The proposed Ndlangisa pedestrian bridge can be accessed through the gravel road from Creighton, starting from municipal gate proceeding south for 4.7km turning right into another gravel road and at 8.6 turning left, then at 12.8km turning right then at 25.9km turning left all gravel roads. At about 27.9km turn left into earth tracks and the bridge is at about 400m. The bridge will be built across Indondeni stream linking Ndlangisa and Mlindeli villages and is in built up areas.
Post date
01/11/2024 - 12:40
Last modified
01/11/2024 - 12:40