CaseDetails
    Summary
    Case ID
    24133
    Case Status
    Heritage Authority(s)
    SAHRA
    LIHRA
    Proposal Description
    The project will consist of the following main components:
    • Proposed construction of several pipelines totalling approx. 67km length with sizes of a diameter between 75mm and 400mm.
    • Proposed construction of approx. 3 steel tanks and 6 concrete reservoirs (sizes between 250m3 and 7 400m3).
    • Two Pump stations at Ga-Malekana WTW (169kW) and Dithamaga (29kW).
    • Construction of access roads to reservoirs and associated platforms with a combined length of approx. 3,1 km.

    Province(s): Limpopo
    Author
    Danie
    Last modified
    06/12/2024 - 09:20
    Reports
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document