CaseDetails
    Summary
    Case ID
    24580
    Case Status
    Heritage Authority(s)
    SAHRA
    LIHRA
    Proposal Description
    Lebalelo Water User Association (LWUA) plans to construct a new 10Mℓ reservoir adjacent to the existing reservoirs at its Borwa Pump Station and a new pipeline between the New Borwa Reservoir and the existing SE1 pipeline (~600m), to provide water to Mototolo Mine. In addition, LWUA plans to rehabilitate a donga area near the current, existing Borwa Reservoir, by infilling the area with excavated material from construction activities at the New Borwa Reservoir area. The proposed project is located on portion 7 of the farm Thorncliffe 374 KT, located near the town of Steelpoort in the Limpopo Province.
    Province(s): Limpopo
    Author
    Suzanne.vanRooy2
    Last modified
    20/03/2025 - 12:38
    Reports
    Heritage Reports linked to this Case
    Heritage Impact Assessment Specialist Reports HIA for SE2 Optimisation and Borwa Reservoir Lara Kraljevic download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document
      Interim Comment Access Document