CaseDetails
    Summary
    Case ID
    24811
    Case Status
    Heritage Authority(s)
    Amafa
    Official Reference

    SAH24/24811 & 24/080

    Proposal Description
    The Dartford Farming Trust intends on developing an in-stream dam on Portion 0 of Lot FP 173 No. 8581 within the Ekamanzi Stream which flows along the northern boundary of the project property. It is anticipated that at full capacity, the proposed dam will cover an area of 37.5 hectares, and have a total capacity of 1 500 000m3. The dam will have a maximum depth of 8m when at full capacity. The dam wall will be 10.5m in height with two spillway channels located on each end of the dam wall. Access to the proposed dam will be gained by existing farm roads. Two pump houses will be constructed – one adjacent to the dam wall, and one along the western edge of the dam. An intake area will be developed with associated outlet pipelines and outlet valves for irrigation use.
    Author
    gavin.anderson
    Last modified
    29/04/2025 - 17:04
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 Dartford Dam Gavin Anderson download
    Official
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Interim Comment Access Document