project no: MGL436903755 length1274.32m line construction at Ga-Sechaba village(RAMPIETZIESFONTEIN 598 LS) Limpopo.
impacted area coordinates are(transformer constructed from23°44'18.65387"S 29°08'34.22875"E) pole no CNG84/19 on the span plan attached. new poles will be erected at 23°44'00.76317"S 29°08'04.79675"E-CNG84/1. 23°44'00.71283"S 29°08'07.32863"E CNG84/2. none environmental,burial or heritage site will be impacted during the construction