    Proposal Description
    This Basic Assessment provides information about the proposed overhead power line between Rethabiseng Substation and Cullinan PV Switching Station; and the proposed Cullinan PV Switching Station. In addition, it will investigate an access road to the authorised Cullinan PV Facility. Its scope is restricted to these mentioned project components.

    The environmental application is for the evacuation of the bulk electricity from the Solar PV Plant. The Switching Station and the 132kV overhead line will be the focus of this application.

    The high-level scope is as follows:

    At Rethabiseng Substation:
     Extension of Rethabiseng Substation
     Establish and equip 1 x 132 kV feeder bay

    At the Cullinan PV Switching Station:
     Construct a 132 kV 3-way Cullinan PV Switching Station close to the solar site

    132kV Line:
     Construct a ±10 km 132 kV line, (Tern Conductor), between Rethabiseng Substation and the Cullinan PV Switching Station

    Access Road
     Clear a 16m wide access road to the Cullinan PV Switching Station and PV plant. (From Cullinan Road 513 entering into the DPW western border, the first 100m of the access road must be 25m wide)

    Laydown Area
     Clear a site of 1.1 hectares to be used during construction

    Site office
     Clear a site of 1.1 hectares to be used as site office

    Province(s): Gauteng
    Author
    ria.pretorius
    Last modified
    12/06/2025 - 09:37
    Reports
    Heritage Reports linked to this Case
    HIA Phase 1 HIA Rethabiseng – Cullinan PV 132kV OHL & Switching Station Anton Pelser download, download
    PIA Phase 1 PIA Rethabiseng -Cullinan Marion Bamford download
    Official
    Case Officers
      Location
      Location
      Decisions, Comments + Permits
      Decision Date Type
      Final Comment Access Document