CaseDetails
Summary
Case ID
25239
Case Status
Proposal Description
This Basic Assessment provides information about the proposed overhead power line between Rethabiseng Substation and Cullinan PV Switching Station; and the proposed Cullinan PV Switching Station. In addition, it will investigate an access road to the authorised Cullinan PV Facility. Its scope is restricted to these mentioned project components.
The environmental application is for the evacuation of the bulk electricity from the Solar PV Plant. The Switching Station and the 132kV overhead line will be the focus of this application.
The high-level scope is as follows:
At Rethabiseng Substation:
Extension of Rethabiseng Substation
Establish and equip 1 x 132 kV feeder bay
At the Cullinan PV Switching Station:
Construct a 132 kV 3-way Cullinan PV Switching Station close to the solar site
132kV Line:
Construct a ±10 km 132 kV line, (Tern Conductor), between Rethabiseng Substation and the Cullinan PV Switching Station
Access Road
Clear a 16m wide access road to the Cullinan PV Switching Station and PV plant. (From Cullinan Road 513 entering into the DPW western border, the first 100m of the access road must be 25m wide)
Laydown Area
Clear a site of 1.1 hectares to be used during construction
Site office
Clear a site of 1.1 hectares to be used as site office
Province(s): Gauteng
The environmental application is for the evacuation of the bulk electricity from the Solar PV Plant. The Switching Station and the 132kV overhead line will be the focus of this application.
The high-level scope is as follows:
At Rethabiseng Substation:
Extension of Rethabiseng Substation
Establish and equip 1 x 132 kV feeder bay
At the Cullinan PV Switching Station:
Construct a 132 kV 3-way Cullinan PV Switching Station close to the solar site
132kV Line:
Construct a ±10 km 132 kV line, (Tern Conductor), between Rethabiseng Substation and the Cullinan PV Switching Station
Access Road
Clear a 16m wide access road to the Cullinan PV Switching Station and PV plant. (From Cullinan Road 513 entering into the DPW western border, the first 100m of the access road must be 25m wide)
Laydown Area
Clear a site of 1.1 hectares to be used during construction
Site office
Clear a site of 1.1 hectares to be used as site office
Province(s): Gauteng
Post date
22/05/2025 - 18:47
Last modified
12/06/2025 - 09:37
Reports
HIA Phase 1 | HIA Rethabiseng – Cullinan PV 132kV OHL & Switching Station | Anton Pelser | download, download | |
PIA Phase 1 | PIA Rethabiseng -Cullinan | Marion Bamford | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document |