CaseDetails
Summary
Case ID
25608
Case Status
Proposal Description
At Zwelethu 132/22kV substation, Build 3-phase Hare line (305m) from new 22kV feeder bay (Zwelethu NB83 22kV feeder) to existing structure with Coordinates: Latitude = 31° 0'4.16"S, Longitude = 30° 2'44.73"E. Dismantle about 140m of 3-phase line between structure Coordinates: Latitude = 31° 0'0.75"S, Longitude = 30° 2'41.44"E and structure Coordinates: Latitude = 31° 0'4.16"S, Longitude = 30° 2'44.73"E. Build 14,9km of 3-phase Hare line from structure Coordinates: Latitude = 31° 0'0.75"S, Longitude = 30° 2'41.44"E up to structure Coordinates: Latitude = 31° 3'43.16"S, Longitude = 30° 8'37.80"E.
Post date
07/07/2025 - 14:10
Last modified
07/07/2025 - 14:10