CaseDetails
    Summary
    Case ID
    15880
    Case Status
    Heritage Authority(s)
    SAHRA
    Proposal Description
    - Upon arrival at the site the core drilling rigs shall be towed on the trailer or truck to
    the first borehole position.
    - Depending on the model, the rig may either be set up on the drilling trailer, or
    offloaded and set up on skids or offloaded with a crane. The rig or trailer is levelled,
    if required sleepers are placed under the skids to create a safe working base and to
    prevent the rig from sinking into soft surfaces during drilling.
    Author
    Seithati.Bolofo
    Last modified
    21/10/2023 - 13:15
      Decisions, Comments + Permits
      Decision Date Type
      Final Decision Access Document