CaseDetails
Summary
Case ID
15961
Case Status
Proposal Description
South32 intends to upgrade the existing railway infrastructure at the Wessels Mine. The upgrade will consist of modifications to the staging rail lines and the design of a new rail balloon. The extension of the railway into the new railway balloon measures at approximately 2 500 m long and 25 m wide and would result in the clearing of indigenous vegetation (more than 1 hectare, but less than 20 hectares). Additionally, the railway would cross a section of the existing tailings dam and would thus result in the removal of approximately 15 000 – 25 000 m3 of material from the tailings area, which would then be deposited on another existing tailings dam. The new railway extension would be located within the existing Mining Right (MR) boundary at the Wessels Mine and amendments to the mine’s Water Use Licence (WUL) are not required.
Post date
09/09/2021 - 14:56
Last modified
23/10/2023 - 17:57
Reports
HIA Phase 2 | HIA: South 32 Wessels Railway Upgrade | Jenna Lavin, Jan Engelbrecht | download, download, download, download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Final Comment | Access Document | |
Final Comment | Access Document | |
Interim Comment | Access Document |