At Mossel Bay, PetroSA needs to institute repairs and modifications to the existing Single Point Mooring System (SPM) infrastructure. Portions of the pipelines have become corroded and PetroSA proposes to install two new ~1.4 km long bypass steel pipelines (12” and 14”), connected to the existing SPM infrastructure, to bypass the corroded section.