CaseDetails
    Summary
    Case ID
    18543
    Case Status
    Heritage Authority(s)
    SAHRA
    Proposal Description
    At Mossel Bay, PetroSA needs to institute repairs and modifications to the existing Single Point Mooring System (SPM) infrastructure. Portions of the pipelines have become corroded and PetroSA proposes to install two new ~1.4 km long bypass steel pipelines (12” and 14”), connected to the existing SPM infrastructure, to bypass the corroded section.
    Author
    vanessa.maitland
    Last modified
    21/10/2023 - 13:28
    Reports
    Heritage Reports linked to this Case
    Heritage Impact Assessment Specialist Reports UHIA for PetroSA Mossel Bay Vanessa Maitland download, download, download, download, download, download