CaseDetails
Summary
Case ID
23225
Case Status
Proposal Description
The Thembisile Hani Local Municipality plans to install a new water pipeline between Gemsbokspruit Reservoir and Tweefontein D Reservoir to allow for the transfer of approximately 312.5 3m/h of water between the two reservoirs. The water pipeline will have to cross the Klipspruit (Stream Crossing C-D; 285 m in length) and one of its tributaries (Stream Crossing A-B; 550 m in length) and associated wetlands. Installation through the streams/wetlands will require trenching/plinths/footing structures. The stream crossings will take place on the Remainder of the farm Tweefontein 675 JR, Tweefontein, Mpumalanga.
Province(s): Mpumalanga
Province(s): Mpumalanga
Post date
01/08/2024 - 12:40
Last modified
19/09/2024 - 17:15
Reports
HIA Phase 1 | HIA Tweefontein | Anton van Vollenhoven | download | |
PIA Desktop | PIA Desktop Study Tweefontein | Heidi Fourie | download |
Official Use
Official
Case Officers
Location
Location
RoDs/Permits
Decisions, Comments + Permits
Decision Date | Type | |
---|---|---|
Interim Comment | Access Document |