Overview
    Identifiers
    Inventory Number
    2724BA11
    Site Name
    Stone Age factory site
    Site Category
    References
    Reference Types
    Other Publication
    Citation
    van Schalkwyk J.A, 2018. Basic Assessment for the Proposed Development of a 115 MW Solar Photovoltaic Facility (Vryburg Solar 3) and Associated Electrical Infrastructure (including 132kV Distribution Line), south-west of Vryburg, North West Province.
    Record Administration
    Author
    Ethe.Mngceke
    Last modified
    Thursday, May 2, 2024 - 21:26
    Archaeology Recordings
    Identifiers
    Recording date
    Recording Media
    Digital Photos
    GPS
    Primary?
    Yes
    Physical Aspects
    Physical Site Type
    Open Site
    Location Type
    Open/Flat
    Classifications
    Archaeological Time Periods
    Stone Artefacts - Rock Types
    Chert
    Quartzite
    Diagnostic Stone Artefacts
    Retouched flakes
      Location
      Location
      Mapping
      -27.01023, 24.73814
      North West
      • Dr Ruth Segomotsi Mompati
      • Naledi
      Administration of Protections
      Administration Description

      Date: 2018-08-16
      - Requires no
      further recording before destruction
      Action Status: Accepted
      Site Action: Conservation

      Grading
      Grading
      Not Conservation Worthy
      Grading Date
      GradingComment

      Generally protected Grade 4C: Low significance Grading by: J.A. van Schalkwyk

      Significance criteria
      Significance Categories
      Level
      Low
      Statement of Significance

      Two reasons are presented for the low grading of this site: The material, located on the ground surface, are not in an original context and therefore have low significance. In addition, the material is spread over quite a large area, with the conclusion that sufficient of the material will be retained when the power line is constructed across a small section of it. Secondly, the impacts of a 132kV powerline on heritage resources are generally low. The size of the pylon base is very small, and generally no roads are bulldozed for maintenance of the line.

      Media
      Images uploaded directly to Site
      Images uploaded to linked Site Recordings